How Should an ALTA Survey Address a Partial Property Taking?

Aerial view of a construction site beside a road and adjacent properties for an ALTA survey

A road widening notice can change your property overnight. When a government agency takes part of your land for a road, sidewalk, or drainage project, your old property lines no longer match what you actually own. Your ALTA survey needs to catch up with this change before you can sell, refinance, or build.

This is happening across Middle Tennessee right now. Several major roads near Nashville are being widened or upgraded. These projects have taken parts of commercial lots, retail pads, and larger tracts of land. If you own property along one of these corridors, you need a survey that shows your land as it is today, not as it was years ago.

What a Partial Property Taking Changes on an ALTA Survey

A partial taking happens when the government takes part of your land for public use. You keep the rest. But once this happens, your old legal description no longer matches the land you actually control.

After a partial taking, your ALTA survey has more work to do. The surveyor must find the new taking line. They need to figure out how much land is left. They also need to check how the taking affects your access, your utilities, and any buildings or features near the new property line. This is more involved than a normal ALTA survey on land that hasn’t gone through this process.

If you are buying property or lending money on it after a partial taking, expect the survey to point out any gaps between the old paperwork and the land as it exists now. These gaps show up often right after a taking, especially before the county updates its records.

Reconcile the Taking Description With the Parent Parcel

The taking description is the legal paper that spells out exactly what land was taken. This usually comes from the state, the county, or a utility company with the legal right to take land for public projects.

The surveyor’s first step is comparing this taking description to your original property description. This shows exactly what was removed. It also checks that the numbers add up. If the taken land plus your remaining land doesn’t equal your original property size, something needs a second look before work continues.

This step catches problems early. Sometimes the taking papers use different reference points or measurements than your original deed. A surveyor who works with these state and utility documents often can spot these mismatches before they cause delays at closing.

For a business property on a widened road, this step also shows how deep the taking went. Did it only take a strip along the road? Or did it cut further into the lot? This changes how much usable space you have left for parking, access, or future building plans.

Show the Remainder Parcel and Its New Boundary

Once the taking numbers match up, the survey needs to draw your remaining land as its own clear shape. This new boundary is what matters now, not your old property lines.

The survey should show the exact new line where the taking happened. It should list the direction and length of that line, just like any other property line. Buyers, lenders, and title companies use this new boundary to confirm the true size and shape of the land being sold or financed.

This part of the survey should also point out anything sitting close to the new line. A parking lot, a sign, a fence, or the corner of a building might have been well inside your property before. Now it could sit right at the edge. It might even sit partly on land that was taken, if construction hasn’t caught up with the paperwork yet.

If you are selling or refinancing property after a taking, ask your surveyor to clearly mark any structures affected by the new line. Lenders and title companies need this information to move forward with the deal.

Document Conditions Along the New Taking Line

A partial taking often comes with construction work. This could be a wider road, a new turn lane, a sidewalk, or drainage pipes tied to the project. Your ALTA survey should record what the land looks like along the new boundary at the time of the survey.

This includes things like new grading, curbs, drainage structures, retaining walls, or moved utility lines from the project. These changes affect how your remaining land works day to day, including how people access your site, where you can park, and how water drains.

For business owners and developers, this record also helps with future planning. If you lost frontage space or an entrance point, you need to know exactly what the land looks like now before deciding what to build or change.

Road projects near growing cities often happen in stages. This means conditions on the ground may still be changing. The survey should clearly note the date it was done, so anyone using it knows exactly what it captured and when.

Coordinate Updated Title Evidence Before Certification

An ALTA survey depends on current title information. After a partial taking, the title work needs to show the land that was taken. It also needs to show any new easements given to the government and any old rights that no longer apply to your remaining land.

Before the survey can be finished and signed, the surveyor and title company usually need to confirm that the recorded taking papers, any settlement terms, and the updated legal description all match. If the county hasn’t finished recording the taking yet, this can create a timing problem. It needs to be worked out with the title company and lender.

If you work with an attorney or title company on one of these deals, ask the surveyor which title report they used. Confirm it reflects the finished taking. A survey based on old title work can miss new easements or rights the government kept. This affects how accurate and useful the survey is at closing.

Handling this step early, rather than waiting until the last minute, helps avoid delays on properties near active road projects.

author avatar
Surveyor

More Posts

Gravel access road between rural homes in Tennessee with survey stakes along the edges, illustrating property line markers for a newly recorded access tract.
boundary surveying
Surveyor

Property Line Markers Around a Newly Recorded Access Tract

The plat is recorded, the new access tract has its own lines, and a gravel drive is already in use. Then someone asks where the tract actually ends, and nobody is quite sure. That gap between paper and ground is where most access disputes start. Property line markers close that

Read More »

Property Line Markers Around a Newly Recorded Access Tract

Property line markers around an access tract do a lot of quiet work. They guide driveway construction, fence placement, utility work, and future maintenance for every lot that relies on the tract. Owners and builders who confirm those markers early avoid disputes that are much harder to settle after pavement

Read More »

Can a Lot Survey Clarify a Separate Private Utility Tract?

You walk your new lot and spot a green utility box, a strip of gravel, and a fence that stops short of the yard’s edge. That strip may not belong to you. Many subdivisions set aside small, separate parcels for sewer lines, water lines, pump stations, or shared drives. A

Read More »
Commercial warehouse loading dock and paved yard where an elevation survey can support loading ramp planning
topographic surveying
Surveyor

Elevation Survey Before Installing a Commercial Loading Ramp

A new loading ramp has to fit three things at once. It must line up with the dock, give trucks room to back in and send water away from the building. An elevation survey gives your design team the real heights of the pavement, dock and doors before anyone picks

Read More »
Construction site with excavators, earthwork, water, and sediment control measures observed during a construction survey
construction
Surveyor

Construction Survey for Sediment Trap Outlet Elevations

A sediment trap can sit in the right spot on a job site and still hold the wrong amount of water. The outlet elevation controls that. If the stone outlet or spillway ends up a few tenths of a foot off the plan, the trap may release muddy water too

Read More »
Industrial property beside railroad tracks, a setting where a boundary line survey can clarify property lines and rights of way
boundary surveying
Surveyor

Boundary Line Survey for Parcels Beside Abandoned Rail Spurs

A rusted spur track runs along the back of an old industrial parcel, and no train has used it in years. You want to reuse the site. Before anyone draws a building, drive or parking lot near that track bed, a boundary line survey should show where the parcel lines

Read More »